From strip mall fitouts to 30-story high rises — every project drawn in 3D, coordinated per submittals, contract documents, and SMACNA standards. Built for mechanical contractors who need drawings they can trust.
We handle the coordination so your field crews can focus on installation. Every drawing is built to match real-world conditions — not just what's on the contract documents.
HVAC ductwork fabrication drawings coordinated per SMACNA standards with optimal routing and minimal joints. Full Revit MEP modeling for rectangular, round, and oval duct systems — drawn the way your sheet metal crews want to build it.
Complete pipe routing, BIM clash detection, and fabrication shop drawings that match field conditions. Accurate hydronic, chilled water, and steam piping layouts with real clearances and access for maintenance.
Plumbing coordination drawings verified for installability — modeled with proper slope, pipe sizing, and insulation. We catch conflicts in the model so your crews don't find them in the ceiling.
Penetration locations, sleeve sizes, and slab opening layouts delivered ahead of schedule. Coordinated across all MEP trades so your concrete pour goes right the first time.
Mechanical equipment pad layouts drawn per submittals and engineer specifications. Precise dimensions for AHUs, chillers, pumps, and rooftop units — poured right the first time.
Robotic total station layout points for precise hanger, sleeve, and opening locations. Exported directly from the BIM model — your field crews spend less time measuring and more time installing.
Healthcare, hospitality, judicial, mixed-use — we've coordinated MEP for projects across the Southeast that demand precision.
MEP coordination project — modeled in 3D, coordinated per SMACNA standards, delivered with confidence.
MEP coordination project — modeled in 3D, coordinated per SMACNA standards, delivered with confidence.
MEP coordination project — modeled in 3D, coordinated per SMACNA standards, delivered with confidence.
Foley Field is the historic home of the University of Georgia Bulldogs baseball program in Athens, Georgia, often called the 'Wrigley Field of the SEC.' The stadium underwent a $45 million renovation from 2024 to 2025, managed by general contractor Turner Construction, which added a state-of-the-art pitching lab, hitting tunnels, a players' lounge, coaches' offices, a weight room, upgraded fan amenities, and replaced the natural grass field with AstroTurf. The renovated facility, which seats approximately 3,633 fans, represents one of the most significant upgrades in the program's history and was completed in time for the 2025 season opener.
Lever Hall is the final phase of Clemson University's $155 million Bryan Mall High Rise Renovation project in Clemson, South Carolina — a comprehensive overhaul of three 11-story residence halls (Byrnes, Manning, and Lever) originally built in the late 1960s that collectively house approximately 1,400 students annually. Designed by Boudreaux + Little and built by Juneau Construction Company, the Lever Hall phase encompasses approximately 110,000 SF of student housing and 8,000 SF of amenity space, with upgrades including fully replaced MEP systems, ADA accessibility improvements, new 'wet-core' private bathrooms, and added study and social spaces on every floor. Lever Hall is scheduled to reopen for the Fall 2026 semester as the culmination of a multi-year effort to extend the useful life of these central-campus residence halls by another 40 years.
The Advanced Materials Innovation Complex (AMIC) is a $130 million, 143,000-square-foot, four-story research and education facility on Clemson University's main campus in Clemson, South Carolina, designed by HOK (Atlanta, GA) and built by DPR Construction. The building serves as the new headquarters for Clemson's Department of Materials Science and Engineering, co-locating faculty and students from Chemistry and Chemical and Biomolecular Engineering under one roof with cutting-edge research labs, undergraduate teaching labs, and collaborative spaces. Opened in early 2026, the facility is designed to achieve 2 Green Globes certification and features electrochromic glass curtainwall with brick detailing to complement the existing campus aesthetic.
MEP coordination project — modeled in 3D, coordinated per SMACNA standards, delivered with confidence.
Nexton Middle School is a new public middle school being developed by the Berkeley County School District in Summerville, South Carolina, within the award-winning Nexton master-planned community near Charleston. Situated on approximately 35 acres near the intersection of Nexton Parkway and Midtown Avenue, the facility is designed to serve grades 6–8 with capacity for up to 900 students. Construction broke ground in December 2023 and the school is anticipated to open for the 2026–27 school year.
MEP coordination project — modeled in 3D, coordinated per SMACNA standards, delivered with confidence.
We're a Southeast-based BIM coordination firm that works exclusively with mechanical contractors. We're not trying to be everything to everyone — we do MEP shop drawings and coordination, and we do it well.
Every project gets drawn in 3D, regardless of size. We coordinate per submittals, contract documents, specs, and SMACNA standards. When your foreman opens our drawings on site, the routing makes sense and the dimensions are right.
Being local means we're in your timezone, we pick up the phone, and we understand how projects move in this market. We've worked on everything from small strip mall tenant fitouts to 30-story towers — the standard doesn't change.
Answers to common questions about our MEP shop drawing and BIM coordination services.
We provide HVAC ductwork fabrication drawings, mechanical piping shop drawings, plumbing coordination drawings, slab opening and sleeve layouts, equipment pad layouts, and total station layout points. Every project is modeled in 3D using Revit and coordinated per SMACNA standards.
We serve mechanical contractors across the Southeastern United States, including Georgia, Florida, Tennessee, Alabama, South Carolina, North Carolina, and Virginia. Being based in Georgia means we're in your timezone and understand how projects move in this market.
Yes. Every project — from strip mall tenant fitouts to 30-story high rises — is fully modeled in 3D using Revit. This allows for accurate clash detection, proper clearance verification, and drawings that match real-world conditions.
We handle projects of all sizes, from small tenant fitouts to large commercial buildings and 30-story high rises. With 267+ projects to date and over 62,400 hours of coordination experience, the standard of quality doesn't change regardless of project size.
Contact us through our website form below, email sales@southeastbim.com, or call . Send us your plans and we'll give you a straight answer on timeline and pricing — whether you're in preconstruction or ready for coordination.
Whether you've got a set of plans ready for coordination or you're still in preconstruction, reach out. We'll give you a straight answer on timeline and pricing.